- November 24th = deadline for almost final prototype!
- BY November 13th, finalize all materials that we want for our project and for the Nicaragua group to make it; also have buckets ready for use
- Be ready for test run by the end of Tuesday the 17th (so that we can do test run on the 20th and make minor modifications)
- Be totally done by end of class on the 20th
- Make time for blog (at least 15-20 minutes at the end of every class)
- Email Lyndsay by Friday (the 13th) with update on overall status of project
Pride/Pain Points (as of November 10, 2015)
- Pride: Pretty much functioned the way we expected (need to make modifications, but these were modifications we anticipated having to make for prototype #2)
- Pride: Low-cost! Low-time commitment!
- Pain: Faucet leaking - faucet was small (as in, didn't allow much water flow), we need to figure out a better way to attach it to the bucket because the little holes where the screws went caused some leaks
- Pain: Bottom of bucket is hard to take off (we think this will be a persistent issue and something we don't want to change)
No comments:
Post a Comment